Civil Engineering MCQs: 3,057 practice questions with answer choices and available explanations. Page 13 of 204.

Civil Engineering MCQs by topic

Now you can submit the latest Civil Engineering MCQs MCQs from your test! SUBMIT HERE

Civil Engineering MCQs

Showing page 13 of 204 · 3,057 total solved questions available.

Study Topic
Start Quiz Mode to Practice Like the Real Exam!
A.The earthwork calculation in excavation is made from the difference in levels obtained with a level
B.All the above
C.The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
D.In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits
Explanation: The correct answer is All the above.

Submitted by: Academy of Pakistan

Share
A.Both A and R are true but R is not the correct explanation of A.
B.A is true but R is false.
C.Both A and R are true and R is the correct explanation of A.
D.A is false but R is true.
Explanation: The correct answer is Both A and R are true and R is the correct explanation of A..

Submitted by: Academy of Pakistan

Share
A.greater than both the active earth pressure and passive earth pressure
B.greater than active earth pressure but less than passive earth pressure
C.less than active earth pressure but greater than passive earth pressure
D.less than both the active and passive earth pressures
Explanation: The correct answer is greater than active earth pressure but less than passive earth pressure.

Submitted by: Academy of Pakistan

Share
A.to designate proper lateral placement of vehicles before turning to different directions
B.to indicate that overtaking is not permitted
C.to designate traffic lanes
D.in roadways meant for two way traffic
Explanation: The correct answer is in roadways meant for two way traffic.

Submitted by: Academy of Pakistan

Share

Continue studying