Pick up the correct statement from the following?
AThe earthwork calculation in excavation is made from the difference in levels obtained with a level
BAll the above
CThe earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
DIn order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits
Correct answer
B. All the above
Explanation
The correct answer is All the above.