The internal size of mould used in brick preparation is________?
Correct answer
A. greater than the size of a fully burnt brick
Explanation
The correct answer is greater than the size of a fully burnt brick.
Correct answer
A. greater than the size of a fully burnt brick
Explanation
The correct answer is greater than the size of a fully burnt brick.
The total kinetic energy of a hoop of mass 2 kg and radius 4 m sliding with linear velocity 8 m/sec and angular velocity 5 radian/sec is________?
Rate of flow of sewage is generally assumed________?
The process of incorporating changes and rescheduling or replanning is called________?
Aerobic bacterias________?
A runoff river plant is________?
A manufacturer produces certain items at a labor cost of P 115 each, material cost of P 76 each and variable cost of P 2.32 each. If the item has a unit price of P 600, how many units must be manufactured each month for the manufacturer to break even if the monthly overhead is P428,000 ________?