2723Civil EngineeringMedium
In the virtual work method, the virtual quantity is________?
Adisplacement
Bmoment
Cload
Dslope
Correct answer
A. displacement
Explanation
The correct answer is displacement.
Correct answer
A. displacement
Explanation
The correct answer is displacement.
hydraulically equivalent, the relationship which holds good, is ________?
P=42EI/L2 is the equation of Euler’s crippling load if________?
A composite beam is composed of two equal strips one of brass and other of steel. If the temperature is raised________?
Bending moment at any section in a conjugate beam gives in the actual beam________?
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is________?
When the degree of saturation is zero, the soil mass under consideration represents________?