2826Civil EngineeringMedium
Main purpose of mean water training for rivers is________?
Aflood control
Bto provide sufficient depth of water in navigable channels, during low water periods
Call of the above
Dto preserve the channel in good shape by efficient disposal of suspended and bed load
Correct answer
D. to preserve the channel in good shape by efficient disposal of suspended and bed load
Explanation
The correct answer is to preserve the channel in good shape by efficient disposal of suspended and bed load.