718Civil EngineeringMedium
A pre-stressed concrete member is preferred because________?
AAll the above
BLarge size of long beams carrying large shear force need not be adopted
CIts dimensions are not decided from the diagonal tensile stress
DRemoval of cracks in the members due to shrinkage
Correct answer
A. All the above
Explanation
The correct answer is All the above.