907Civil EngineeringMedium
The expected out turn for earth work in excavation in ordinary soil per workman per day is________?
A3.00 cum
B4.00 cum
C1.00 cum
D2.00 cum
Correct answer
A. 3.00 cum
Explanation
The correct answer is 3.00 cum.
Correct answer
A. 3.00 cum
Explanation
The correct answer is 3.00 cum.