During load shedding:
Asystem voltage is reduced
Bsystem frequency is reduced Efficiency is the secondary consideration in
Csystem power factor is changed
Dsome loads are switched off
Correct answer
D. some loads are switched off
Explanation
The correct answer is some loads are switched off.