1233Mechanical EngineeringMedium
The time which results in the least possible direct cost of an activity is known as________?
Aslow time
Bcrash time
Cstandard time
Dnone of the above
Enormal time
Correct answer
A. slow time
Explanation
The correct answer is slow time.