Control in design of an information system is used to________?
Ainspect the system and check that it is built as per specifications
Bensure privacy of data processed by it
Cprotect data from accidental or intentional loss
Densure that the system processes data as it was designed to and that the results are reliable
Correct answer
D. ensure that the system processes data as it was designed to and that the results are reliable
Explanation
The correct answer is ensure that the system processes data as it was designed to and that the results are reliable.