A.The maximum rate of storm runoff is called peak drainage discharge
B.All the above
C.The period after which the entire area starts contributing to the runoff, is called the time of concentration
D.Rational method of estimating peak run off, may be used precisely for areas less than 50 hectares
Explanation: The correct answer is All the above.