2346Civil EngineeringMedium
Normally prestressing wires are arranged in the________?
Alower part of the beam
Bupper part of the beam
Ccenter
Danywhere
Correct answer
A. lower part of the beam
Explanation
The correct answer is lower part of the beam.
Correct answer
A. lower part of the beam
Explanation
The correct answer is lower part of the beam.
The stone suitable for rubble masonry should be________?
Select the incorrect statement?
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as________?
Horizontal acceleration due to earthquake results in________?
________ is the element of value which a business has earned through the favorable consideration and patronage of its costumers arising from its well known and well conducted policies and operations?
The expected out turn of half brick partition wall per mason per day is________?