2502Civil EngineeringMedium
For laying the railway track, materials required are________?
AFish Bolts
BBearing Plates
CRails
DFishPlates
Correct answer
D. FishPlates
Explanation
The correct answer is FishPlates.
Correct answer
D. FishPlates
Explanation
The correct answer is FishPlates.
Direct measurement of permeability of the specimen at any stage of loading can be made________?
The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known________?
Cement concrete sewers are only suitable if non-scouring velocity is between________?
Pitch of tacking rivets, when double angles connected back to back and acting as tension members should not be more than________?
The shear strength of a soil________?
Which of the following is not a water borne disease?