Direct measurement of permeability of the specimen at any stage of loading can be made________?
Correct answer
C. only in fixed ring type consolido-meter
Explanation
The correct answer is only in fixed ring type consolido-meter.
Correct answer
C. only in fixed ring type consolido-meter
Explanation
The correct answer is only in fixed ring type consolido-meter.
If the tendon is placed at an rectangular beam (sectional top edge)________?
For laying the railway track, materials required are________?
The ratio of maximum sewage flow to average sewage flow for trunk mains having diameters more than 1.25 m, is________?
The type of bond provided in brick masonry for carrying heavy loads is________?
Average annual rainfall at any station is the average of annual rainfall over a period of________?
The stem of a cantilever retaining wall which retains earth level with top is 6 m. If the angle of repose and weight of the soil per cubic metre are 30° and 2000 kg respectively, the effective width of the stem at the bottom, is________?