743Civil EngineeringMedium
If the maximum spring rise is 2 m and height of the waves expected is 4 m, then the breakwater height above the datum will be________?
A4 m
B2.5 m
C5 m
D7 m
Correct answer
D. 7 m
Explanation
The correct answer is 7 m.
Correct answer
D. 7 m
Explanation
The correct answer is 7 m.