1813Civil EngineeringMedium
For initial estimate for a beam design, the width is assumed________?
A1/20th of span
B1/30th of span
C1/25th of span
D1/15th of span
Correct answer
B. 1/30th of span
Explanation
The correct answer is 1/30th of span.
Correct answer
B. 1/30th of span
Explanation
The correct answer is 1/30th of span.
Heel divergence is________?
Earliest finish of an activity is always________?
As per IS specifications, the maximum final setting time for ordinary Portland cement should be________?
If an ascending gradient of 1 in 50 meets a descending gradient of 1 in 50, the length of summit curve for a stopping sight distance of 80 m will be________?
When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________?
Pick up the correct statement from the following?